| ||||||||
| Permits and Services | Forms and Information | Contacts | FAQ Page | |||||
Underground Storage Tank ProgramUST Inspection, Enforcement and Plan Check
REGULATORY BACKGROUND The Fire Department regulates the construction, operation, repair and removals of underground storage tank (UST) systems. Recent State regulatory changes require additional testing and more frequent inspections at UST facilities. These new regulations require close coordination between inspectors, contractors and the regulated community. The Fire Department assumed responsibilities for UST Programs in 1983. INSPECTION AND ENFORCEMENT Annual facility inspections are mandated by State law and are performed by Fire Department Inspectors. These inspectors coordinate with UST facilities to schedule inspections when appropriate technical staff is available to inspect monitoring systems and other tank components. PLAN CHECK AND INSPECTION FOR TANK MODIFICATIONS Plans for installation, modification and removal of USTs are reviewed by Inspectors at the City’s Construction Service Center at 201 N. Figueroa St. located on the 3rd Floor. Following approval of plans, periodic field inspections are scheduled to complete the construction project. SITE ASSESSMENT Soil sampling is conducted during many UST procedures and the results of those sampling activities may initiate the Site Assessment process. Contaminated sites are tracked to ensure clean-up and remediation efforts are completed. The Fire Department refers sites with groundwater contamination to the Los Angeles Regional Water Quality Control District. MORE INFORMATION Unified Program Information – Information and downloadable forms for the Unified Program Certificate of Financial Responsibility (PDF 116.99KB) California Fire Code Section – Landowner Notification (PDF 72.60KB) Hazardous Material Categories and Disclosure Amount (PDF116.99KB) LAFD Requirement 41 – UST Tank Abandonment (PDF 251.03KB) Unified Program Permit Package (Includes all sections DOC 2.70MB) Unified Program Permit Package (Includes all sections ZIP 1.23MB) Unified Program Permit Package – Intro (DOC 1.9MB) Unified Program Permit Package – Intro (ZIP 1.10MB) Unified Program Permit Package – Section 1 (DOC 191KB) Unified Program Permit Package – Section 2 (DOC 219KB) Unified Program Permit Package – Section 3 (DOC 278KB) Unified Program Permit Package – Section 4 (DOC 647KB) Underground Storage Tank Installation Checklist (PDF 167KB) Site Assessment Information – Guidelines for Site Assessment documents and reports. UST Site Assessment - Report General Guidelines UST Site Assessment - Report Content Guide UST Site Assessment - Workplan Content Guide
Division
5 Permit Application for Underground Tanks and Associated
Systems
Request for Fire Prevention Records (PDF
84KB)
| ||||||||
| News | LAFD Home | |||||||