UST Plan Check Fees

UNDERGROUND STORAGE TANKS SPECIFIC ACTION PERMIT FEES
Fees for Special Services are $254/hour Effective March 18, 2019, L.A.M.C. 57.105.7.8
 

                                    UST Specific Action Permit Fees

 
Tank Installation: Plan Check, Inspection, Soil Report Review$3048
12 hr. minimum*
Tank Abandonment by Removal: Plan Check, Inspection, Soil Report Review$2286
9 hr. minimum*

$762 for each addt'l tank
3 hr. minimum
Tank Abandonment-in-Place: Plan Check, Inspection, Soil Report Review$2286
9 hr. minimum*

$762 for each addt'l tank
3 hr. minimum
Tank System Major Modifications, Add or Alter: Plan Check, Inspection, Soil Report$3048
12 hr. minimum*
Tank Entry Relining Repairs: Plan Check, Inspection, Soil Report$1524
6 hr. minimum*
Tank System Minor Modification or Repair: Plan Check, Inspection$762
3 hr. minimum*
Tank System Minor Repair Performed During Routine Inspection$254
1 hr. minimum*
Soil Report Review : Business Initiated Reports or Business Requests for No Further Action (Inspector Review of File)$3048
12 hr. minimum*
Expedite Plan Check or Site Assessment: In addition to Specific D5 Permit$420
4 hr. minimum**
Addition to original
permit
Contractor Changes, Additional Plan Check (LAMC 57.105.7.8.2) $254
1 hr. minimum*

 

* If additional time is required for Fire Department processing, the responsible party will be billed
at the current hourly rate in effect.

**Expedite hourly rate is $105/hour. If additional time is required for Fire Department processing, the responsible party will be billed at the current hourly rate in effect.
 