UNDERGROUND STORAGE TANKS SPECIFIC ACTION PERMIT FEES
Fees for Special Services are $254/hour Effective March 18, 2019, L.A.M.C. 57.105.7.8
UST Specific Action Permit Fees
Tank Installation: Plan Check, Inspection, Soil Report Review | $3048 12 hr. minimum* |
Tank Abandonment by Removal: Plan Check, Inspection, Soil Report Review | $2286 9 hr. minimum* $762 for each addt'l tank 3 hr. minimum |
Tank Abandonment-in-Place: Plan Check, Inspection, Soil Report Review | $2286 9 hr. minimum* $762 for each addt'l tank 3 hr. minimum |
Tank System Major Modifications, Add or Alter: Plan Check, Inspection, Soil Report | $3048 12 hr. minimum* |
Tank Entry Relining Repairs: Plan Check, Inspection, Soil Report | $1524 6 hr. minimum* |
Tank System Minor Modification or Repair: Plan Check, Inspection | $762 3 hr. minimum* |
Tank System Minor Repair Performed During Routine Inspection | $254 1 hr. minimum* |
Soil Report Review : Business Initiated Reports or Business Requests for No Further Action (Inspector Review of File) | $3048 12 hr. minimum* |
Expedite Plan Check or Site Assessment: In addition to Specific D5 Permit | $420 4 hr. minimum** Addition to original permit |
Contractor Changes, Additional Plan Check (LAMC 57.105.7.8.2) | $254 1 hr. minimum* |
* If additional time is required for Fire Department processing, the responsible party will be billed
at the current hourly rate in effect.
**Expedite hourly rate is $105/hour. If additional time is required for Fire Department processing, the responsible party will be billed at the current hourly rate in effect.